�?Even so, if the pressure stabilization time is six min, the fitting degree is the bottom and the evaluation result of the drilling fluid lost control effectiveness is “average.�?In a specific range, the coincidence degree from the indoor and field drilling fluid lost control performance is negatively correlated with the stress balance